Full remediation at low cost

The need for an overall arrangement of the demolished parts and those to be reclaimed entailed a very deep movement of the lands of the entire area of the Park, with a gigantic but rationalized building site with a relatively low overall cost. The intervention on the entire park, of 4.5 hectares of which 2.8 of green, has cost less than 3 million euros.

The Park building site 2011-2014 filmed from the roofs of the Docks Dora

Events calendar:
Bordi metropolitani

Share on:
short URL:

License